合水县日产50万方液化天然气(LNG)及提氦项目配套低温液化冷箱如期进入配管安装阶段。
The low temperature liquefaction cold box supporting the 500,000 square meters of liquefied natural gas (LNG) and helium extraction project in Heshui County entered the piping installation stage as scheduled.